Guidance. Procedure for granting the right to use subsoil plots for the construction and operation of hydrocarbon storage facilities and (or) geological survey and assessment of the suitability of a subsoil plot for the construction and operation of the said hydrocarbon storage facilities
In stock
Product details
Document Number
Guidance
Title
Procedure for granting the right to use subsoil plots for the construction and operation of hydrocarbon storage facilities and (or) geological survey and assessment of the suitability of a subsoil plot for the construction and operation of the said hydrocarbon storage facilities
Document status
Active, Most Current
Pages count
11
View all details
Product details
|
Document Number
|
Guidance |
|
Title
|
Procedure for granting the right to use subsoil plots for the construction and operation of hydrocarbon storage facilities and (or) geological survey and assessment of the suitability of a subsoil plot for the construction and operation of the said hydrocarbon storage facilities |
|
Document status
|
Active, Most Current |
|
Pages count
|
11 |
|
Published
|
01.01.2022 |
|
Delivery time
|
3 business days |
|
Format
|
Electronic (pdf/doc) |
|
Delivery
|
download |
|
SKU
|
81596 |
